Gros Ventre Slide and Kelly Flood (Wyoming, 1927)
Introduction
On June 25th, 1925 at approximately 4PM, a section of Sheep Mountain approximately 2,000 feet wide and approximately one mile long slid down the mountain at an estimated 50 miles per hour and rode 300 feet up the slope opposite of the Gros Ventre River. The slide is estimated to have a volume of 50,000,000 cubic yards of rock and debris and at the time was the largest “rockslide” in the historical record of the United States. The site is located approximately 14 miles northeast of the town of Jackson, WY. Remarkably, the 1925 landslide claimed no direct loss of life. A rancher, Guil Huff, had a homestead in the path of the slide and was able to ride his horse at full speed to escape the surging debris. He provided firsthand accounts of the slide. Guil along with a couple of other nearby ranchers estimated that the slide had a duration of around 2 to 3 minutes.
The slide obstructed the Gros Ventre River, effectively forming a natural dam approximately 200 feet tall with a length of approximately 1,000 feet. Water began rising behind the dam due to the wet spring and significant snowpack. While the slide spared Guil Huff’s life as well as his wife and daughter, the water from the 210 sq. mi. watershed above the slide started flooding his house approximately 12 hours after the slide and within a week, his house began floating on the lake, soon joined by a ranger station. The water continued rising until it reached approximately 5 feet below the crest of the slide dam. While not explicity noted described in available documentation, it is presumed that baseflow was passing through the slide embankment. For months following the slide, residents in Kelly, located 7 miles downstream of the slide dam, were very worried that the newly formed dam would fail. Subsequently numerous geologists and engineers from around the country visited the slide to assess the materials and soundness of the slide dam. They concluded that the dam is safe and now a permanent feature of the landscape. This included the State Engineer, Frank Emerson, who provided a detailed assessment of the slide published in the Wyoming State Tribune and Cheyenne State Leader. He estimated that water levels would decrease and stabilize around 25 feet below the slide crest, though it was not documented on how this prediction was developed.
The material in the slide generally consisted of sandstone and limestone rock with sizes varying from boulders to house sized masses along with trees and other vegetation and decomposed material; this presumably provided some permeability to pass typical baseflow. Other observations noted that the boulders and big blocks were generally located on the outer front of the dam while the top of the landslide dam appeared to be composed of fine grain material including silts, sands and clay. While there were still concerns from the residents of Kelly, the new slide dam was able to safely pass the spring snow melt during 1926, which helped to ease those concerns. However, the winter of 1926 had very light snowfall with no typical spring flood event.
Geological Setting
The underlying geology played a critical part in the formation of the massive Gros Ventre rock slide. The rock formations involved in the slide are the Tensleep sandstone and Amsden shale formations of Pennsylvanian age. At the slide location, these sedimentary strata have a strike approximately east-west and a downward dip of approximately 20 degrees toward the Gros Ventre River, which had cut through the overlying Tensleep formation.
The slide occurred along the contact of the Tensleep sandstone formation and the saturated Amsden shale formation. These formations are susceptible to landslides evidenced by numerous slides of various ages in the Gros Ventre River valley. It is speculated that multiple factors are likely responsible for the Gros Ventre slide as well as other regional slides. These include: 1) steepening of the lower slopes of the Gros Ventre River valley by glaciation, 2) loss of a portion of the Tensleep formation through incision by the Gros Ventre River which left a gap in the stratum across the river, 3) heavy precipitation and snowmelt that saturated the contact between the strata, and 4) potential earthquake shaking to help trigger the slide. An excellent figure was developed as part of a USGS study, Remembering the Gros Ventre Slide of 1925 as a way of marking the 100th anniversary of the slide. It is an oblique lidar shaded relief map looking up the Gros Ventre River Valley showing the formations involved in the 1925 slide as well as other regional slides.
The Gros Ventre slide was predicted by former resident Billy Bierer, a local miner and hunter who sold the property where the slide occurred to Guil Huff in 1920. According to oral tradition of the Nelson Family (Fern Nelson, 1975), the following remarks can be attributed to Billy Bierer, “Anywhere on that slope, if I lay my ear to the ground, I can hear water tricklin’ and runnin’ underneat. It’s runnin’ between strata and some day if we have a wet enough spring, that whole mountain is gonna let loose and slide... Give it a wet enough year and all that rocky strata will just slide right down on that gumbo like a Beaver’s slickery slide.”
Factors Contributing to the Slide
The winter of 1924-1925 had significant snowpack which was estimated to vary in snow water equivalent ranging from two to four feet at the end of March 1925. This was accompanied by very high rainfall in the region in May through June 1925, and minimum temperatures remaining above freezing, which led to rapid snow melt and runoff through the Gros Ventre River valley. Additionally, minor earthquakes occurred in the region including an estimated 3.5 magnitude earthquake the night prior to the rock slide. It is presumed that this combination of significant rainfall and snowmelt resulted in saturation of the contact between the Tensleep sandstone formation and the Amsden shale formation, effectively reducing the coefficient of friction between the formations. The shaking ground from the earthquake further destabilized the contact and resulted in triggering of the rock slide.
June 23rd Failure of the Gros Ventre Slide Dam
Numerous landslides have occurred throughout the world that have obstructed rivers, creating natural landslide dams such as the Gros Ventre Slide. A report published by the United States Geological Survey in 1991, Documented Landslide Dams from Around the World, indicates that the majority of landslide dams fail quickly with 55% failing within one week and almost 90% failing within one year.
Thus, there is some validity of the previous engineering and geologists' assessments that the Gros Ventre Slide was stable in 1925 and a permanent landscape formation as it did remain intact for almost two years. However, the winter of 1926-1927 brought unusually high snowpack to the valley. This combined with heavy rainfall during May 1927 contributed to the lake level rising quickly and started overtopping low points along the slide crest on May 17, 1927. On May 18th, 1927, Ranger Dibble and others were routinely collecting debris upstream of the Kelly Bridge and started to notice a significant increase in driftwood as well as a hayrack that had been stuck in the Slide Lake. He immediately drove his Model T up to the landslide dam and saw that a significant portion (approximately top 60 feet) of the dam had breached. Upon confirmation of the breach, he immediately turned around to try and warn the citizens of Kelly. Following the full breach of the slide dam, there was only about 15 minutes for the residents of Kelly to evacuate before being exposed to a 50-ft tall wall of water and debris. Despite Ranger Dibble’s efforts to warn the citizens, the town of Kelly was exposed to devastating flooding conditions with more than 75 structures washed away to their foundation and six lives were lost. There is little information in regards to the exact timing of the flood. One account from Anne Kent who lived in and ran the Post Office and local store in Kelly in 2027 notes that, “Sometime in the forenoon, the dam gave way and by 11:30 the town of Kelly was washed away, the residents had realized that a large amount of water was coming and most of them left for high ground.” (Dave Killingbeck, Cowboy State Daily May 31, 2025).
Re-Creating the Gros Ventre Slide Breach and Kelly Flood
As part of this case study and HEC-RAS two-dimensional (2D) hydraulic model was developed in an effort to replicate the breach and estimate flood depths and velocities through the town of Kelly and further downstream along the Snake River. The model was developed from a high resolution lidar based digital elevation model with a cell size of 1-ft x 1-ft. Based on this data, the current elevation of Lower Slide Lake is approximately EL 6912 (NAVD 88). Historical USGS topographic mapping from 1899 was used to assess channel elevations in the Gros Ventre River prior to the rock slide. At the center of the slide the original channel elevation was estimated to be around EL 6775. The dam height was estimated to be approximately 200 ft tall based on historical information, providing a crest elevation of around EL 6975. The breach was assumed to have a bottom width of 400-ft, a bottom elevation of EL 6915 based on historical information and topographic mapping. The breach formation time was assumed to be approximately 2 hours based on historical accounts.
The leading edge of the breach hydrograph was predicted to arrive in Kelly approximately 1 hour after initiation with peak flooding depths occurring approximately 2 hours after initiation. Flooding depths are predicted to range from approximately 1 ft to 15 ft, with the most severe flooding closest to the channel. Flood velocities were estimated to be approximately 10 – 15 ft/s through the town of Kelly which would support how the devastating flood washed away almost all of the structures that existed in the town. Interestingly, the Kelly Elementary School was predicted to have minimal exposure to the flood, which is consistent with it being one of three structures that survived the flood.
References
(1) Voight, G. (1978). Developments in Geotechnical Engineering – Rockslides and Avalanches, 1 Natural Phenomena.
(2) Wilson, W. (1957). Geology of the Gros Ventre Project, Teton County.
(4). U.S. Forest Service. (1962). A Brief History of the Gros Ventre Slide Geological Site.
(9) Owen, C. (2021, May 19). Flood Washed Out Kelly This Week in 1927. Jackson Hole News and Guide.
(10) History Jackson Hole. (2019, June 19). Reliving the Gros Ventre Slide and Flood. Buckrail.
This case study summary was peer reviewed by Nathaniel Gee, P.E., Ph.D. (Tennessee Valley Authority).
Lessons Learned
High and significant hazard dams should be designed to pass an appropriate design flood. Dams constructed prior to the availability of extreme rainfall data should be assessed to make sure they have adequate spillway capacity.
Learn more
Timely warning and rapid public response are critical to saving lives during a dam emergency.
Learn moreAdditional Lessons Learned (Not Yet Developed)
- Landslide dams are not engineered structures, and the majority fail within one year of formation.
- Locals, even if not formally educated, can provide excellent information related to geologic formations.
- Landslide dams should be evaluated for the construction of a spillway, such as at Quake Lake Dam in Montana.
Federal Guidelines for Dam Safety - Emergency Action Planning for Dams